White steel doors and windows installation 3 elements

Your current location: Home >> News >> Industry news

White steel doors and windows installation 3 elements

Date:2017-07-17 Author: Click:

1. before installation

Pleases nstall holes on the back, main lock body, auxiliary lock, reaming, 45 degree angle and 30 edge welding glass.

2. installation time

A. please pour dry pulp, no wet pulp, and top frame for foam.

B. installation as far as possible, avoid punching installation holes.

3. after installation

A. Inspect immediately whether the cement slurry water seeps into the board surface, if there is, please tear off the protective film at the first time, let the air flow, immediately remove, to avoid alkaline materials such as cement slurry corrosion to the board surface, pay special attention to near the bottom of the floor door frame, vulnerable to pollution and corrosion.

B. scrub in clean water and dry with dry cloth.

C. If the house is not completely completed after the installation of the door, other parts such as the exterior wall, pay attention to the protection of the late decoration process, such as washing water do not stain the door board.

White steel doors and windows

1. before installation

Please install holes on the back, main lock body, auxiliary lock, reaming, 45 degree angle and 30 edge welding glass.

2. installation time

A. please pour dry pulp, no wet pulp, and top frame for foam.

B. installation as far as possible, avoid punching installation holes.

3. after installation

A. Inspect immediately whether the cement slurry water seeps into the board surface, if there is, please tear off the protective film at the first time, let the air flow, immediately remove, to avoid alkaline materials such as cement slurry corrosion to the board surface, pay special attention to near the bottom of the floor door frame, vulnerable to pollution and corrosion.

B. scrub in clean water and dry with dry cloth.

C. If the house is not completely completed after the installation of the door, other parts such as the exterior wall, pay attention to the protection of the late decoration process, such as washing water do not stain the door board.


Tags:白钢门窗